Projects
S/NO. |
DESCRIPTION OF WORK SCOPE |
DURATION OF EXECUTION | CLIENT |
PROJECT LOCATION |
| 1 |
DETAIL
SURVEY OF S.P.D.C. RA GOLF COURSE |
12 DAYS |
AANDERAAH
NIG. LTD. FOR S.P.D.C. |
PORT
HARCOURT |
| 2 |
POSITIONING
SURVEY FOR PEARSON SURVEY OF 100KM
PIPELINE |
60 DAYS |
INTERSITE
NIG. LTD. FOR AGIP |
OGODA-BRASS |
| 3 |
PRE-DREDGE
SOUNDING SURVEY OF SPDC ORUBIRI
FLOWSTATION ACCESS SLOT. |
10 DAYS | TERINO SURVEYS FOR SPDC | URUBIRI FIELD |
| 4 |
PRE-DREDGE SOUNDING SURVEY OF SPDC ORUBIRI WELL 4 LOCATION ACCESS SLOT | 10 DAYS | TERINO SURVEYS FOR SPDC | URUBIRI FIELD |
| 5 |
PRE-DREDGE SOUNDING SURVEY OF SPDC ALAKIRI WELL 25 LOCATION ACCESS SLOT | 12 DAYS | TERINO SURVEYS FOR SPDC | ALAKIRII FIELD |
| 6 |
PRE & POST DREDGE SOUNDING SURVEY OF EKEREMOR SHORE PROTECTION | 14 DAYS | GEO LINK SERVICES FOR OMPADEC | EKEREMOR |
| 7 |
PRE & POST DREDGE SOUNDING SURVEY OF AGBERE-ODONI SHORE PROTECTION | 12 DAYS | GEO LINK SERVICES FOR OMPADEC | AGBERE-ODONI |
| 8 |
CONSTRUCTION OF 3/BEDROOM RESIDENTIAL BUNGALOW | 40 DAYS | ESSENTIAL GOODS AND SERVICES LTD | PORT HARCOURT |
| 9 |
F/P SURVEY OF 40KM OGBIA OLOIBIRI ROAD | 52 DAYS | AANDERAAH NIG. LTD. | OGBIA–OLOIBIRI BAYESA STATE |
| 10 |
SUPPLY OF THEODOLITES, EDM AND ACCESSORIES | 30 DAYS | NEW OIL FIELD AND ALLIED SERVICES LTD. NOAS | PORT HARCOURT |
| 11 |
PIPELINE CORROSION SURVEY | 65 DAYS | NEW OIL FIELD AND ALLIED SERVICES LTD. NOAS | TEBIDABA BRASS |
| 12 |
DETAIL SURVEY OF BISENI 1,45 AND ACCESS ROAD | 50 DAYS | AANDERAAH NIG. LTD | BISENI |
| 13 |
ROOF REPAIR/RUG CLEANING AND INSTALLATION OF ¾ DELIVERY NOZZLE | 8 DAYS | MOBIL OIL NIG. PLC | PORT HARCOURT |
| 14 |
LAYOUT SURVEY AND PROPERTY SURVEY | INDIVIDUALS | PORT HARCOURT | |
| 15 |
DETAIL SURVEY OF I.A CABLE ROUTE | 45 DAYS | TOPTAY FOR SPDC | PORT HARCOURT |
| 16 |
INTEGRITY SURVEY OF AKRI KWALE | 45 DAYS | NOAS FOR AGIP | PORT HARCOURT |
| 17 |
INTEGRITY SURVEY OF OSHA OGODA | NOAS FOR AGIP | ||
| 18 |
INTEGRITY SURVEY OF SHELL WEST PIPELINE | 40 DAYS | CENTURY FOR SPDC | WARRI |
| 19 |
INTEGRITY SURVEY OF 24” & 25” BRASS MANI – BRASS TEM. P/LINE | 45 DAYS | NOAS FOR AGIP | BRASS |
| 20 |
ROUTE SURVEY OF ODAGWA 1 & 11 ELECTRIFICATION PROJECT | 18 DAYS | DAIIK FOR SPDC | IMO RIVER FIELD |
| 21 |
ROUTE SURVEY OF EDEGBERI ELECTRIFICATION PROJECT | 15 DAYS | VEETEK FOR SPDC | ADIBAWA FIELD |
| 22 |
ROUTE SURVEY OF RUMUEKPE ELECTRIFICATION PROJECT | 20 DAYS | DAIIK FOR SPDC | RUMUEKPE FIELD |
| 23 |
ROUTE SURVEY OF AKENFA ELECTRIFICATION PROJECT | 10 DAYS | VEETEK FOR SPDC | ETELEBOU FIELD |
| 24 |
ELECTRIFICATION
ROUTE SETTING OUT SURVEY FOR BUKUMA
COMMUNITY |
14 DAYS | MORGREEN FOR SPDC | BUKUMA |
| 25 |
ROUTE
SURVEY OF AHIA ELECTRIFICATION PROJECT |
10 DAYS | VEETEK FOR SPDC | ETELEBOU FIELD |
| 26 |
BILLE
ELECTRIFICATION DESIGN PROJECT SURVEY |
15 DAYS | POINT ENGINEERING LIMITED | AWOBA FIELD |
| 27 |
AS –
BUILT SURVEY OF 10” SANTABABRA TO
TORA MANIFOLD
|
20 DAYS | DATA MAT LTD / DEC OIL & GAS LTD | SANTABABRA |
| 28 |
AS –
BUILT SURVEY OF SECTION OF ECTL ROW
FROM BONNY TERMINAL TO KC MANIFOLD
|
21 DAYS | DATA MAT LTD / DEC OIL & GAS LTD | BONNY |
| 29 |
ROUTE VERIFICATION SURVEY FOR CCAGG
PROJECT
|
50 DAYS | DAEWOO
FOR SHELL (POINT ENGINEERING) |
CAWTHORNE CHANNEL |
| 30 |
POSITIONAL / AS-BUILT SURVEY OF BORE
HOLE POINTS
|
15 DAYS |
DAEWOO FOR SHELL
(POINT ENGINEERING)
|
CAWTHORNE CHANNEL |
| 31 |
DETAIL & TOPOGRAPHICAL
SURVEY OF EGP-3
|
45 DAYS | DELTATEK FOR CHEVRON | ESCRAVOS |
| 32 |
PIPELINE ROUTE SURVEY FOR STORM
WATER DISCHARGE
|
90 DAYS | INTEGRATED QUALITY TECH. LTD | NINTH MILE (ENUGU) |
| 33 |
BATHYMETRIC SURVEY OF 10” DIEBUCREEK
CROSSING AND 14” RUMUEKPE TL RIVER
CROSSING
|
10 DAYS | POINT ENG. /SPDC | RUMUEKPE |
| 34 |
PIPELINE SURVEY OF IBEWA-OBAGR GAS
LINE
|
8MTHS. | WECO ENG./TOTALFINAELF | OBAGI |
| 35 |
PEROMETER / TOPOGRAPHICAL SURVEY OF
UAC PROPERTIES
|
15 DAYS | UAC | PORT HARCOURT |
| 36 |
PRODUCTION OF AS-BUILT SURVEY OF
FEDERAL GOVT. LANDED PROPERTIES IN
LAGOS
|
20 DAYS | PRESIDENCY | IKOYI LAGOS |
| 37 |
HYDROGAPHIC SURVEY OF SUBMARINE
CALBE ROUTE AT KAA & KPEAN
|
10 DAYS | ROCKSONS ENG. | GOKANA (RIVERS) |
| 38 |
SOIL
INVESTIGATION WORK FOR AFAM VI POWER
STATE
|
30 DAYS | DAEWOO | AFAM (RIVERS) |
| 39 |
PERIMETER SURVEY OF 60.0 HECTARES AT
SAPELE
|
14 DAYS | ROCKSON | SAPELE |
| 40 |
COMPREHENSIVE SURVEY OF 100, PLOT OF
LAND AT ELEME
|
21 DAYS | OWEL HOLDINGS LTD. | ELEME (RIVERS) |